30 September 2026
Social Facilities in Aktobe Region to Connect to Heating System Starting October 2
Heating system connections for social facilities in the Aktobe region will begin on October 2, ensuring readiness for the autumn-winter season.

The connection of social facilities to the heating system in the Aktobe region is scheduled to begin on October 2.
The region's readiness for the upcoming heating season was discussed at a meeting led by the regional akim, Askhat Shakharov.
Arystan Aitbayev, the head of the Department of Energy and Housing and Communal Services, reported that the main activities necessary for the stable passage of the autumn-winter period have been completed. The thermal, electrical, water supply, and sewage networks have been serviced, and the boilers and equipment have been checked.
Special attention has been paid to fuel. Budget organizations are fully supplied with coal and diesel fuel. Reserves are adequate to meet the needs of social facilities. The supply of household coal for the population remains stable. New batches arrive by rail, and fuel sales are conducted on schedule. According to the department, there is currently no coal shortage.
The main utility companies in the region are prepared for the heating season. The Aktobe CHP has checked the main equipment, secured the necessary gas volumes, and provided for backup fuel. The plant will be able to maintain the required heating parameters throughout the season.
At Aqtobe Su-Energy Group, repair work on boilers and heating networks has been completed. The company has provided the necessary conditions for uninterrupted heat and water supply to consumers. In "Energysystem," the electrical networks and equipment have been brought up to standard to ensure reliable power supply during the autumn-winter period.
Read also:
The housing sector is also ready for the heating season. In apartment buildings, internal heating systems, engineering networks, and equipment have been checked. Preparedness passports and readiness certificates have been issued for the facilities.
Special teams have been formed to handle emergency situations. They are equipped with machinery and necessary materials and are on duty around the clock.
Thus, the region has the necessary resources to start the heating season. Starting October 2, social facilities will begin connecting to the heating system. The heat supply and passage through the heating season will be under constant control.
"The main thing now is to ensure residents have comfortable conditions during the autumn-winter period. All utility services must work in harmony and respond promptly to citizens' requests. Special attention should be paid to areas where problems arose last year. It's unacceptable for people to be left without heat due to lacking necessary resources. The heads of the relevant organizations must personally monitor the situation and take timely measures," instructed the regional head.
Reported by ЖКХ24 referencing the official website of the Department of Energy and Housing and Communal Services of the Aktobe Region.
Photo: gov.kz